An important initiative that will make life so much better for the disabled and elderly.
Work for the Hartsdale station elevator is expected to be completed by late summer and includes following:
• Installation of steel for the walkway connecting elevator to overpass on the west side (inbound)
• Installation of all glass, and roofing and railing for the walkway
• Installation of elevators cab and components, and machine room components
• Perform required testing and commissioning of elevators
• Installation of sidewalk curbing at elevator street entrances
• Installation of new lean bars and benches in the overpass
• Restoration of disturbed areas including some landscaping as requested by the Town
PAUL FEINER
Greenburgh Town Supervisor